Costa Coffee, Spring Road Success Story.
This Osprey hub, located in Wolverhampton, hosts four high-power rapid chargers that can add up to 100 miles of charge in just 10 minutes. This was the first site in the UK to deploy dynamic load balancing chargers, which enable more locations than ever before to host multiple high-powered chargers on a single site.
The partnership in numbers.
1st
site in the UK to use Dynamic Load Balancing chargers
74%
reduction in chargepoint footprint
100miles
of range can be added in just 10 minutes
61tons
CO2 saved in the first 6 months of operation
Located adjacent to the A463, the hub serves major transport routes in the area that see more than 130,000 vehicles each day. It has a Costa Coffee on-site, allowing drivers to relax and make use of the facilities while they charge.
Osprey worked closely with Deeley Construction, who delivered the new Costa Coffee site at which the hub is located and Connect It Utility Services, who ensured the high power charging installation was built and energised on time and to high quality.
“
As a company, we have achieved carbon neutral status and are targeting net zero by 2036. Therefore, it is vital to us that we include sustainable features in all of our developments. Electric vehicles are at the heart of the drive to reduce carbon emissions and the high-power charging hub at the new Costa Coffee site will make it easier and more accessible for drivers in the region to go electric, and as a result reduce their carbon footprints.
Martin Gallagher, Managing Director of Deeley Construction
More success stories...
Marston's PLC
Success StoryCardiff Council
Success StoryPurley Cross Retail Park
Success StoryDuchy of Cornwall
Success StoryWork with us.
We fully-fund our own turnkey supply and installation solution for commercial EV charging. We work with landlords, local authorities and developers to build the charging network for the next generation of EV drivers.